• 大小: 5KB
    文件类型: .rar
    金币: 2
    下载: 1 次
    发布日期: 2021-06-09
  • 语言: 其他
  • 标签: IEEE  

资源简介

进行潮流计算所需要的IEEE39节点 30 节点关键数据

资源截图

代码片段和文件信息

function mpc = case39
%CASE39 Power flow data for 39 bus New England system.
%   Please see CASEFORMAT for details on the case file format.
%
%   Data taken from [1] with the following modifications/additions:
%
%       - renumbered gen buses consecutively (as in [2] and [4])
%       - added Pmin = 0 for all gens
%       - added Qmin Qmax for gens at 31 & 39 (copied from gen at 35)
%       - added Vg based on V in bus data (missing for bus 39)
%       - added Vg Pg Pd Qd at bus 39 from [2] (same in [4])
%       - added Pmax at bus 39: Pmax = Pg + 100
%       - added line flow limits and area data from [4]
% % % %       - added voltage limits Vmax = 1.06 Vmin = 0.94
%       - added identical quadratic generator costs
%       - increased Pmax for gen at bus 34 from 308 to 508
%         (assumed typo in [1] makes initial solved case feasible)
%       - re-solved power flow

%   Notes:
%       - Bus 39 its generator and 2 connecting lines were added
%         (by authors of [1]) to represent the interconnection with
%         the rest of the eastern interconnect and did not include
%         Vg Pg Qg Pd Qd Pmin Pmax Qmin or Qmax.
%       - As the swing bus bus 31 did not include and Q limits.
%       - The voltages etc in [1] appear to be quite close to the
%         power flow solution of the case before adding bus 39 with
%         it‘s generator and connecting branches though the solution
%         is not exact.
%       - Explicit voltage setpoints for gen buses are not given so
%         they are taken from the bus data however this results in two
%         binding Q limits at buses 34 & 37 so the corresponding
%         voltages have probably deviated from their original setpoints.
%       - The generator locations and types are as follows:
%           1   30      hydro
%           2   31      nuke01
%           3   32      nuke02
%           4   33      fossil02
%           5   34      fossil01
%           6   35      nuke03
%           7   36      fossil04
%           8   37      nuke04
%           9   38      nuke05
%           10  39      interconnection to rest of US/Canada
%
%   This is a solved power flow case but it includes the following
%   violations:
%       - Pmax violated at bus 31: Pg = 677.87 Pmax = 646
%       - Qmin violated at bus 37: Qg = -1.37  Qmin = 0
%
%   References:
%   [1] G. W. Bills et.al. “On-Line Stability Analysis Study“
%       RP90-1 Report for the Edison Electric Institute October 12 1970
%       pp. 1-20 - 1-35.
%       prepared by E. M. Gulachenski - New England Electric System
%                   J. M. Undrill     - General Electric Co.
%       “generally representative of the New England 345 KV system but is
%        not an exact or complete model of any past present or projected
%        configuration of the actual New England 345 KV system.
%   [2] M. A. Pai Energy Function Analysis for Power System Stability
%       Kluwer Academic Publishers Boston 1989.
%       (re

 属性            大小     日期    时间   名称
----------- ---------  ---------- -----  ----

     文件       9670  2019-04-25 16:24  case.39.m

     文件       4999  2018-10-31 17:45  case30.m

----------- ---------  ---------- -----  ----

                14669                    2


评论

共有 条评论